国产精品一二三四区免费,久久久噜噜噜888久久,国产真实乱子伦精品视频,中文字幕乱码亚州无线码二区

Stock code:871165
Mobile phone +8613829250070 中文
Online Message Common problem

Industry information

Your current position: Home > News> Industry information

Precautions of central feed system installation

Source: Popularity:5366 Publication time:2017-11-23 15:47:29 smallmiddlebig

The central feeding system realizes the 24 hours continuous feed operation for the pellets, and can change the colors flexibly to meet the requirements of multi-color and multi-varieties of the products. Depending on the production of different molding machines, flexible changes in the amount of feed. Multiple feed pipe design, to ensure the diversification of the main requirements. The system has a variety of monitoring and protection functions, work safe and reliable. The last Hengrong technicians also introduced the advantages of planning and using the central feeding system in the injection molding workshop, and today we will share the installation precautions for the central feeding system.


中央供料系統(tǒng)


Central feed system installation has the following precautions:


1, the size of the machine placed the exact location of the way drainage pipe.
2, pay attention to the raw material room and system control layout.
3, observe the plant wall structure, determine the weight of the pipeline.
4, pay attention to the overhead crane, ceilings, pillars.
5, the central feeding pipe, try to reduce corners.
6, the pipe is allowed to control the condition about 3 meters high, easy to install and follow-up maintenance.
7, when connecting the pipe to ensure that the pipe clamp is the center of the docking, the pipeline is strictly prohibited leakage.
8, pay attention to the installation of pipe injection molding machine in charge of position, so as not to oppose it will not affect the appearance.

On the central feed system installation precautions, we introduce to you here. The ease of use of the central feed system reduces the labor costs and, secondly, the reduction of raw material belts and associated auxiliaries next to the injection molding machine increases space utilization. In addition, due to the central feeding method, correspondingly reduced a lot of stand-alone equipment, it saves energy and reduce maintenance costs, installation and application is very extensive.

Relevant information
主站蜘蛛池模板: 成安县| 永靖县| 贵德县| 灵山县| 郴州市| 临湘市| 英德市| 本溪市| 双牌县| 辛集市| 乌拉特中旗| 武鸣县| 固原市| 鹤峰县| 兰考县| 壤塘县| 右玉县| 扎囊县| 宜丰县| 怀集县| 浦城县| 静宁县| 潜山县| 沂源县| 万盛区| 林芝县| 台东县| 洛扎县| 沧源| 商城县| 黄浦区| 雅江县| 义马市| 南阳市| 通渭县| 张家口市| 黄平县| 金湖县| 屏东县| 唐山市| 察雅县|